Skip to content
Sales & engineering0936 388 012 · Zalo on the same number
OfficeNo. 45 Street 5, Van Phuc City, Hiep Binh Ward, Ho Chi Minh City, Vietnam
Get directions →
Free site survey

Rooftop solar – Nam Thien Long Factory

Capacity722.3 kWp
LocationLots 6-8-10-12, Road 3, Tan Tao Industrial Park, Ho Chi Minh City
Estimated generation925 MWh/year
TimelineGroundbreaking: 30/10/2025
Solar system on the roof of Nam Thien Long Factory, Tan Tao Industrial Park

Rooftop solar project at Nam Thien Long Factory, Lots 6-8-10-12, Road 3, Tan Tao Industrial Park, Ho Chi Minh City, with a capacity of 722.3 kWp.

The system is estimated to generate about 925 MWh of electricity per year, avoiding about 629 tonnes of CO₂ per year (based on 4.5 peak sun hours/day and a grid emission factor of 0.68 kg CO₂/kWh).

Project photos

Installing solar panels at the Nam Thien Long project, Tan Tao Industrial Park, Ho Chi Minh City
Installing panels on the roof
Installation team at the Nam Thien Long Factory project, Tan Tao Industrial Park
Installation team on site

Want a similar system? Call 0936 388 012 for a free site survey.

Call now

Related articles

4,001.02kWp
Factories & businesses

Rooftop solar – Hoa Phat Long An Steel Factory

Thuan Dao Industrial Park (expansion), Long An

Rooftop solar – Eclat Textile Factory
Factories & businesses

Rooftop solar – Eclat Textile Factory

Road 5A, Nhon Trach II Industrial Park, Dong Nai

3,745.7kWp
Factories & businesses

Rooftop solar – Tam Lang Rice Mill

Co Do, Can Tho City

2,147kWp
Factories & businesses

Rooftop solar – Viet Tri Yarn Factory

Road 9, Rach Bap Industrial Park, Tay Nam Ward, Ho Chi Minh City

Zalo